OSAF Weekly Status 24 March 2006
This report covers the period from Mar 17-Mar 24 2006 (one week).
Highlights
- Chandler
- DetailedAlpha2Plan
- First pass at background syncing, available via "Test | Sharing | Enable background syncing"
- Cosmo
- Cosmo 0.2.8 was released and announced. It is available for download now.
- Scooby
- Lots of work on the 0.2 release planning. We have rough estimates for each feature. As a team, we're digging to the next level of detail to determine more detailed scope and recommendations for in/out for 0.2.
Design and PM (Sheila)
Progress:
- Finished all Chandler alpha2 specs.
- Finished and presented Chandler alpha 2 plan.
- Launched strategy discussions and planning.
- Scooby 0.2 planning continues.
Plans:
- Scooby 0.2, feature finalization.
- More 1.0 strategy planning.
- Chandler 0.7 performance targets and prep for alpha 3 planning.
Application WG (Philippe)
- Progress
- 0.7alpha2 moving forward
- Progress on all main features
- Email notification of events demoed this morning at the Staff meeting
- Plan
- Continue to monitor 0.7alpha2 tasks and bugs count
- More progress on current 0.7alpha2 tasks
More details available in
AppsMeeting20060323
Platform WG (Katie)
- Progress:
- Plans:
- More work on background sync, eggs
- Commit timezone changes (smart-naive timezones)
- Focus on finishing alpha2 work
QA, Build and Release (Heikki/Aparna)
- Progress:
- Installed cosmo 0.2.8 on qacosmo and ran compatibility tests against current code of chandler
- Ran tests against the checkpoint build and filed bugs
- Scooby 0.1 testing in progress
- Cosmo 0.3 test plan in progress
- Fixed bugs in the CATS framework to enhance reporting
- Triaged the regressions assigned to 0.7 release and assigned them to the alphas.
- Plans:
- Complete Scooby 0.1 testing
- Run compatibilty tests against Cosmo 0.3
- Identify new features going into Chandler and work with dev to add functional tests for those.
Cosmo and Scooby (John)
Progress:
- Cosmo
- Cosmo 0.2.8 was released and announced. It is available for download now.
- Refactoring of Jackrabbit node usage is now done. We plan to start testing this next week.
- Brian Kirsh continues to fix defects for Cosmo 0.3
- Brian Mosley refactored the test directories for Cosmo into Functional and unit tests.
- Scooby
- Scooby 0.1 is basically done. We're working on the documentation and landing pages at this point.
- Lots of work on the 0.2 release planning. We have rough estimates for each feature. As a team, we're digging to the next level of detail to determine more detailed scope and recommendations for in/out for 0.2.
- Scooby 0.1 branch created. The source tree is now open for 0.2!
Plans:
- Cosmo
- Continue to work towards closing out 0.3 release. (Migration tool, bug fixes)
- Work with FoxMarks? to test our jackrabbit changes for 0.3.
- Get all potential future features into Bugzilla.
- Scooby
- Continue to work on Scooby 0.2 planning. Goal: Get rough outline of plan for 0.2 done and out to the list this week.
- Get a number of Scooby related design discussions up and running on the design list. (We need to get clarity on a number of issues for 0.2 release)
- Push 0.1 bug fixes into 0.2 source tree.
IT (Jared)
Progress:
Plans:
Community (Pieter/Ted)
Progress:
Plans:
- Lock down details for the Core Sprint week, and May WAC meetings
- Developemnt work on draft landing page sites for Cosmo and Scooby.